
Kitchen renovation in Paris
TIMSTROY renovates kitchens in apartments and houses in Paris and the inner suburbs: layout, building services, installation and finishes. Cooking without crossing the room, putting things away without searching, gathering around a clear worktop: it all starts with how you use your kitchen.
- Paris and the inner suburbs
- Coordinated trades
A layout built around your routines
A kitchen is designed around what happens in it: preparing, cooking, washing up, storing. The sink, hob and fridge come first, then the worktop that links them, with enough room to move between them. Single run, L-shaped, U-shaped or with an island: the shape depends on the room, the windows and the existing services. The sink usually stays close to the drainage; a distant hob or an island needs electrics brought to it and, for an island sink, water and drainage under the floor. Opening the kitchen onto the living room is decided at this stage, according to the building and the co-ownership rules.
Water, drainage, electrics and air
Behind the cabinet fronts, each appliance has its own needs. Services are reworked before installation, while the walls are still accessible.
- Drainage: the sink, dishwasher and, where relevant, washing machine join the stack with a steady fall; this is what most limits moving the sink.
- Water supplies: each connected appliance benefits from an accessible shut-off valve.
- Electrics: the NF C 15-100 standard provides for dedicated circuits for the hob, oven and large appliances, as well as sockets above the worktop.
- Cooker hood: an extraction hood needs a duct to the outside and is not connected to a VMC; a recirculating hood filters the air and returns it to the room.
Installation, worktop and splashback
Installation begins once the services, walls and floor are ready. Base units are levelled and wall units fixed to a surface that can carry them: a lightweight partition is reinforced first. The worktop is cut for the sink and hob, then the splashback protects the wall from water and grease; its material is also chosen for the heat near the hob. In this kitchen renovated in Paris, light cabinet fronts, wood-effect worktops and a white splashback form a whole, with storage and shelving around the worktop. The kitchen of our Paris apartment renovation is also among our projects; in its photograph, the appliances were added digitally.
How your works unfold
A kitchen involves a plumber, electrician, kitchen fitter, tiler and painter. Your project manager coordinates their work on a single schedule. To compare proposals item by item, read our guide to comparing a quote.
- Free on-site consultation: the room, the existing services, your habits and priorities.
- Detailed quote: works, quantities and materials, options priced separately, schedule agreed before work begins.
- Dedicated project manager: regular visits and weekly reports with photos.
- Handover: finishes and equipment operation checked with you.
- 12 months of adjustments and touch-ups after handover, on top of statutory guarantees.
Projects in this field
All projectsFrequently asked questions
Can the wall between the kitchen and living room be removed?
Removing the wall between the kitchen and living room depends first on its nature: a partition is simpler to take down than a load-bearing wall. A load-bearing wall requires a structural study to size the support and, in a co-owned building, approval from the general meeting of co-owners, as the structure is generally part of the common areas. Circulation, lost storage and odour extraction also need to be considered.
Can the sink or hob be moved?
Moving the sink or hob is possible if the services can follow the new position. For the sink, everything depends on the fall available to the stack; for the hob, on a dedicated electrical circuit and, with an extraction hood, on the route for a duct. We review these points during the on-site consultation.
Extraction or recirculating hood: which should I choose?
An extraction hood expels air outside and removes moisture and odours more effectively, but it needs a dedicated duct; it is not connected to a VMC. A recirculating hood filters the air and returns it to the room: it is easier to install, but its filters need regular maintenance. In a co-owned building, an outlet through the façade changes the exterior: co-owners’ approval is required, and planning formalities may be too.
How long does a kitchen renovation take?
Duration depends on the extent of the works, the services to be reworked and the manufacturing or delivery time for units and worktop. A stone or ceramic worktop is often measured once the units are installed, which adds a stage. The schedule is agreed before work begins and sets out each stage.
Do I need the co-owners’ approval to renovate a kitchen?
Renovating a kitchen within private areas generally does not require an owners’ meeting vote, subject to the co-ownership rules. Approval from the general meeting is required as soon as the works affect common areas or the exterior: a load-bearing wall, alterations to a shared riser or stack, a hood outlet through the façade. These points must be checked before work begins.
