Skip to content
Living room and wet area
TIMSTROY Projects← Projects · Renovation

Living room and wet area

In Paris, a renovated living room with a separate toilet, vanity and onyx-effect shower; repainted walls and new floors.

Location
Paris

The challenge

Bring a separate toilet, basin and shower into the room, then renew the walls and floors while distinguishing the wet area from the rest of the space.

A living room and a wet area, with two palettes that echo each other. In Paris, TIMSTROY created a layout with a separate toilet, vanity and shower, then renewed the room’s walls and floors. Onyx-effect tiles and smoked glass give the wet area its presence; light grey and taupe accompany the rest of the space.

Arranging the wet area

At the back of the room, the toilet occupies a separate cubicle with a door. A two-drawer vanity supports a countertop basin beneath a round illuminated mirror. A space for a washing machine is provided beside it. The wet area opens onto the room, with the toilet kept separate.

Giving the shower its place

The shower sits on a low-profile tray. Large onyx-effect tiles cover the walls up to the ceiling and extend across the wet-area floor. A smoked-glass screen and a shower column with an overhead head complete the arrangement: the material connects the different surfaces.

Renewing the whole room

The walls are repainted light grey, with a taupe wall shaping the view. White skirting boards and new carpet accompany the rest of the floor up to the tile boundary. The transition between coverings makes the room’s different zones visible.

What the site photograph shows

The works photograph documents tiles being laid with levelling spacers, the installed shower tray, and water and drainage connections before fitting the equipment.

The project in pictures

  • The finished wet area: separate toilet, vanity unit below a round illuminated mirror and an onyx-effect tiled shower.
  • The renovated room, with the wet area at the far end.
  • Walls repainted in light grey and taupe, white skirting boards and new carpet.
  • During the works: tiles laid with levelling clips and the shower tray in place.

Other projects

A similar project?

A first reply within two working days.

Request a quote